+ Reply to Thread
Page 2 of 2 FirstFirst 12
Results 11 to 12 of 12
  1. #11
    Join Date
    Aug 2013
    Location
    Jerilderie
    Posts
    1,062
    Thanks
    493
    Thanked
    519
    Reviews
    0
    Achievements:Topaz Star - 500 posts
    Ok I see you are in WA. Regulations over there is plans have to be signed off by an engineer unless things have changed. That can be anything upto $1600 on its own. I drew my own plans and provided all the specifications etc and I think it cost me $400 for a rubber stamp from an engineer around Fremantle somewhere.


    Dave The Turning Cowboy

    turning wood into art

  2. #12
    Join Date
    Oct 2011
    Posts
    817
    Thanks
    155
    Thanked
    249
    Reviews
    0
    Achievements:Topaz Star - 500 posts
    A company just quoted us $36000- in NSW. They were a renovation firm, and that was all inclusive


    Me 27 + Him 28 =
    DD- 20.7.2012
    #2 due 28.1.2014
    6 angels loved and missed.


 

Similar Threads

  1. Approx cost top story extension, 1 bedroom.
    By 2BlueBirds in forum House & Gardens
    Replies: 4
    Last Post: 18-01-2013, 21:27
  2. moving from bassinet in our room into a cot in her room
    By strawberry swing in forum Babies (3 - 6 months)
    Replies: 11
    Last Post: 04-12-2012, 22:39

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
FEATURED SUPPORTER
ProSwimProSwim runs learn to swim classes for babies, children and adults. Our indoor centre in Plympton Park has lessons all ...
REVIEWS
"Pigeon teats rule!"
by Alex
Pigeon PP Wide Neck reviews ›
"Wonderful natural Aussie made product!"
by Mrstwr
Baby U Goat Milk Moisturiser reviews ›
"Replaced good quality with cheap tight nappies"
by Kris
Coles Comfy Bots Nappies reviews ›